ECODRY
SLUDGE DRYING
Tolem is your competent partner for drying applications
we offer to our clients:
• feasibility studies and process development
• operation of plants at clients site
• turn-key plants
• main components for drying plants from own manufacturing
• laboratory- and pilot - tests
• toll drying
Process Technology
example: sewage sludge drying
In a first swep sewage sludge will be dewatered
mechanically. Feed to the plant by means of a slurry
pump. The drying process takes place in three levels.
After passing the third level the dry product is
discharged and transferred to a storage place.
The vapors containing 95% steam are liquefied in
downstream condenser. Condensate will be recycled
to the feed of the sewage works.
Organic compounds will be decomposed in a biological
filter.
The dryer modules are heated by a thermal oil unit.
The vessel can be heated either by natural gas,
sludge gas or fuel oil.
Dryer plant and hot oil unit are placed in a drain
tray for protection of environment.
process scheme of a sewage slurry drying
plant:
|